Education
Scott Joplin Elementary School

Since Uppteam trains its designers to be US building code-compliant, designing an HVAC system adhering to SMACNA standards was relatively easy for the MEP team. Working with minimal client input, including the design document set, MEP trade, and architectural and structural drawings, our team created a detailed construction document set for mechanical ducting, piping, and coordination with other building disciplines.
Utilizing Revit and Naviswork, we developed a detailed 3D model of the HVAC ducting and piping. The final output, provided in PDF format, included detailed dimensions for ducts and pipes from columns and grids, duct and pipe bottom elevations, and duct tags.
Location : Chicago
Service : Mechanical, CD Set Creation
Project Area : 109,408 Sq. Ft.
Software : Revit, Navisworks
Category : Education

Education
Other Projects
