Project Type: Commercial
Software: AutoCAD
Project Duration: 55 hours

Task Assigned

One of Uppteam’s long-term clients wanted to engage us again to deliver comprehensive plumbing design support for a modular restaurant project. The project was based in Asheville, North Carolina. A core requirement of this project was to create the plumbing system from the ground up, including layouts, schedules, risers, and calculations. Simultaneously, we also had to ensure code compliance and constructability within a limited delivery window. This project mandated close coordination and accurate documentation to ensure efficient installation throughout the kitchen, dining, drive-thru, restroom, freezer, and service areas.

Project Timeline

  • Phase 1 - At the very first stage of the project, our expert team reviewed the modular restaurant’s requirements and worked on establishing the preliminary plumbing strategy. The next step was to check fixture counts, equipment needs, and space constraints early. We were committed to creating an efficient system layout that matches the modular design approach.
  • Phase 2 - The next phase tasks began with drafting thorough plumbing layouts using AutoCAD. The layouts covered all functional spaces, involving restrooms, kitchen operations, pot wash, drive-thru, and support spaces. Moreover, we developed plumbing fixtures and equipment tables to maintain precise placement within the constrained footprint of the modular unit.
  • Phase 3 - In this final phase, first, the client reviewed all the progress made during the previous two phases. Next, Uppteam incorporated feedback efficiently and locked in the plumbing documentation set. The final deliverables comprised coordinated layouts, risers, schedules, and calculations planned for downstream coordination and construction use.

Additional Notes

  • This project demonstrated numerous coordination difficulties because of a stringent delivery timeline and space constraints implicit in modular construction.
  • Uppteam dealt with these by developing clear plumbing fixtures and equipment schedules. This facilitated aligning drawings with on-site requirements.
  • Strategic incorporation of plumbing systems ensured ideal positioning without compromising constructability or functionality.
  • The client profoundly acknowledged the completeness and clarity of the deliverables. They were substantially satisfied with the drawings and Uppteam’s responsiveness across the entire project.
  • By effectively handling plumbing coordination within the expedited schedule, Uppteam delivered a fully operational, well-coordinated plumbing design. This design ensured seamless execution and fulfilled both technical and client expectations.